Skip to content
CORE CONSTRUCTION SOLUTION

Resort and farm

Resort and farm

Construction of a resort and farm in Marjayoun in 2010. The photos show landscaped grounds with stone-paved terraces, steps, a fountain, gazebo, lawns, flower beds and asphalt access roads, from groundwork and paving to the finished site. The scope was construction works, documented stage by stage.

Resort and farm – 1
Image 1 of 12
Department
Engineering & Research Consulting
Location
Marjayoun
Period
2010
Work
Construction