Integrated school complex

Construction of an integrated school complex in Baghdad, Iraq, carried out between 2016 and 2018. The scope covered civil works, electromechanical installations, an Olympic pool, low-current systems, a theatre and a control room. The photos follow the site from earthworks and rebar foundations to the finished buildings, pool, theatre hall and classrooms.
Gallery
- Department
- Engineering & Research Consulting
- Location
- Baghdad, Iraq
- Period
- 2016–2018
- Work
- Construction, electromechanical works, Olympic pool, low-current systems, theatre and control room
